Question 1

During a daily production meeting, the materials manager discusses a priority shipment that is being delayed due to material being placed on hold from a nonconformance. The process engineer was present when the material was placed on hold and states that the nonconformance will not impact fit. form or function. The manufacturing manager shares that per the ISO standard, the risk should be accepted and the product should be shipped. Which action would be most appropriate for the quality engineer to take first?


Answer: C
Question 2

A process that is in statistical control has the following characteristics. X 122 J? = 2! n = 5 What are the upper and lower control limits for the A'chart of this process?


Answer: C
Question 3

Failure mode, effect, and criticality analysis, (FMECA) is primarily for the purpose of


Answer: B
Question 4

Which of the following actions best describes quality function deployment (QFD)? 


Answer: C
Question 5

Rank in order from first to last, the following steps in analyzing experiments. 1. Performing hypothesis tests on factors 2. Estimating a mathematical model 3. Checking assumptions 4. Using the model for prediction


Answer: A
Page:    1 / 36      
Total 176 Questions | Updated On: Jun 03, 2025
Add To Cart

© Copyrights TheExamsLab 2025. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the TheExamsLab.